Free change order form for contractors
A construction change order template that shows the client exactly what changed, what it costs, what the contract total is now and how it moves the schedule, with both signatures before the work starts.
Free to use and edit. No email or sign-up needed.
How to fill out a change order
-
Number it and tie it to the contract
Number change orders in order (CO-1, CO-2) and note the original contract date. Anyone reading it later can follow the trail.
-
Show the running contract total
Original contract amount, the total of earlier change orders, this change order, and the new contract total. Clients accept a change more easily when they see the whole picture, not just one more charge.
-
Describe and price each change
One line per change, specific enough that nobody can read it two ways: "Replace rotted subfloor under tub, 32 sq ft", not "subfloor repair". A change can also be a credit, entered as a negative amount.
-
Schedule impact and reason
How many working days the change adds and the new completion date, plus why it happened: a client request, a hidden condition, a code requirement or a design change.
-
Both sign before the work starts
The client approves, you sign, and only then do you do the work. A change order signed after the fact is a negotiation.
When you need a change order
Any time the work, the price or the schedule moves away from the signed estimate or contract. The common ones are the client asking for something extra, a hidden condition found once walls or floors are open, a material that is no longer available, or an inspector requiring something the plans did not show.
Small changes count too. A few hundred dollars of extras, each agreed with a nod on site, is how a profitable job becomes a break-even one and a happy client becomes a disputed final invoice.
Why the signature comes first
Most residential contracts say changes must be agreed in writing, and in many states that is the law for home improvement work. A change order signed before the work protects you if the client later disputes the final bill, and it protects the client from surprise charges. It also forces the conversation about price while the client can still say no, which is when they are most reasonable about it.
Handling hidden conditions
Rotted framing, old wiring and water damage are not your fault, but they are your problem the moment you find them. Stop, take photos, price the fix, and send the change order with the photos attached. Clients rarely argue with a picture of the rot. Mention in your original estimate that hidden conditions will be priced as a change order, so this is expected rather than a surprise.
When you outgrow the template
Change orders signed on a phone, in minutes.
In BuilderBase you create a change order from the approved estimate, attach photos, and send it. The client signs on their phone, the project total and budget update on their own, and the approved change can be pulled into your next invoice.
7-day free trial, no credit card. Pro is $99/mo with 10 users, Starter is $39/mo.

Questions
Is this change order form free?
Who signs a change order?
Can a change order reduce the price?
Do I need a change order for a small extra?
What if the client refuses to sign?
How should change orders show up on the final invoice?
More free templates
Line items, tax, deposit received and balance due. Fill it in online or download it.
Construction Estimate TemplateA contractor estimate with sections, tax, a deposit on approval and a client signature line.
Roofing Estimate TemplatePriced by the square, with roof size, pitch, tear-off layers and a decking allowance.
Painting Estimate TemplateWalls, ceilings and trim priced by the square or linear foot, with prep and products spelled out.